My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC38821
DRMS
>
Back File Migration
>
Inspection
>
INSPEC38821
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:43:44 PM
Creation date
11/18/2007 11:07:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
6/20/2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo C-1981-019 <br />20 June 2007 ~~7 <br />Pg 2/6 <br />Roads (cont.): -The roads in the southern expanses of the West Pit for access to the <br />Bower and Kiewit projects was well maintained and appeared to be stable at the <br />time of the inspection. These roads run along the west edge of the West Pit and up to <br />the top of the section 16 Pit on the west side. No erosional problems were noted on <br />these roads at the time of the inspection. There was some fugitive dust on the Kiewit <br />roads. Please see the section on "Air Resource Protection" for more detailed <br />information regarding the dust at the Kiewit project. <br />- The road to the 101 dragline working in the East Pit area was stable and well <br />maintained at the time of the inspection. No erosional problems were noted on this <br />road. <br />Hydrologic Balance: -The wash bay pond (not a NPDES discharge point) contained <br />water approximately four feet below the top of the embankment and was not <br />discharging. This is a total containment pond and discharge into the Work Area Pond <br />triggers BTEX testing (in addition to regular NPDES testing). The operator and the <br />contractors use this pond for water for their water trucks. The pond embankment was <br />well vegetated and appeared to be stable at the time of the inspection. No <br />erosional problems were noted on the pond embankment at the time of the <br />inspection. <br />-The work area pond (NPDES 002A) contained water approximately two feet below <br />the top of the discharge pipe and was not discharging at the time of the inspection. <br />The pond embankment was well vegetated and appeared to be stable at the time <br />of the inspection. No erosional problems were noted on the embankment at the <br />time of the inspection. <br />-The Gossard Pond (NPDES 003A) contained water approximately three feet below <br />the riser pipe and was not discharging at the time of the inspection. The pond <br />embankment was well vegetated and appeared to be stable at the time of the <br />inspection. No erosional problems noted on the embankment at the time of the <br />inspection. The emergency spillway is a 12" culvert. There is sediment in the pond <br />that will need to be cleaned out this summer to maintain proper pond capacity. <br />Tony Tennyson indicated that the pond would be cleaned sometime this summer. <br />- All of the roadside ditches appeared to be clean and functioning as designed at <br />the time of the inspections. No erosional problems, sediment build-up or blow-outs <br />were noted at the time of the inspection. <br />-The West Pit Pond (NPDES 008A) contained a small pool of water and was not <br />discharging at the time of the inspection. There was also a small pool of water in the <br />presettling sump at the inlet of the pond. The pond embankment was well <br />vegetated and appeared to be stable at the time of the inspection. No erosional <br />problems noted on the embankment at the time of the inspection. The emergency <br />spillway is an open, trapezoidal riprapped channel. The spillway was stable and well <br />maintained at the time of the inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.