Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 01a <br />Date : 12/18/2002 <br />User: SSS <br />PermiUjob#:M-1983-209 <br />Abbreviation :none <br />Filename :M209-Ofa <br />Agency or organization name : DMG <br />Permit or other job action : Routine Reclamation Cost Estimate Update <br />Task description : Cut artd fill reduction of east parcel highwal! <br />I - - ----- -- -- - -- - - - -- -- - - - - -- - - - - <br />HOURLY EQUIPMENT COST <br />CIRCES Cost Estimatin4 Software <br />BULLDOZER WORK <br />State :Colorado <br />County :Delta <br />Site ;Benton Dawson Gravel <br />Basic machine :Cat D8R - 8SU Horsepower : 305 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 ;3-shank doper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $49.50 NA <br />OperatingcosUhour : $65.98 100 <br />Ripper op. cosUhour : $1.50 20 <br />Operator cost/hour : $27.99 NA <br />Total unit cosUhour : $144.97 Total fleet cosUhour : $144.97 <br />`------~ ----'-~------- ------ ----------- ----- -----I <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1, 400 CCY factor : 1.060 volume : 1,484 LCY <br />Source of estimated volume :Asume 127-1 x 700'L highwa!! reduced to 3H:1 V <br />Source of estimated swell factor :CAT Handbook <br /> <br />HOURLY PRODUCTION ~ ~ Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 12.00 % (i <br />Average site altitude : 5,000 feet <br />Material weight <br />Weight description <br />Gravel - Pitrun <br />JOB TIME AND COST <br />3,250 Ibs/LCY <br />Operator skill: 0.75 (avg.) <br />Material consistency : 0.90 (Cat HB, <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (ishiR/da, <br />Spoil pile : 0.70 (ind-m0 <br />Push gradient : 1.27 (Cat HB, <br />Altitude : 1.00 (Cat H8, <br />Material weight : 0.71 (Cat HB, <br />Blade type : 1.00 (S/SUN <br />Net correction : 0.35 <br />Adjusted unit production : 492.38 LCY/hr <br />Adjusted fleet production : 492.38 LCY/hr <br />Fleet size : 1 Dozers) Total job time : 3.01 Hours <br />Unit cost : $0.294 /LCY Total job cost : $437 <br />