My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC38685
DRMS
>
Back File Migration
>
Inspection
>
INSPEC38685
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:43:39 PM
Creation date
11/18/2007 11:07:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983209
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DMG
To
Western Slope Construction Co
Inspection Date
11/20/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECTIDENTIFICATION <br />Date: 18-Dec-2002 Permitorjob no.: M-1983-209 <br />User : SSS Abbreviation : none <br />Filename : M209-000 <br />f--` <br />Agency or organization name :DMG <br />Permit or job action :Routine Reclamation Cost Estimate <br /> <br />Site :Benton Dawson Gravel <br />State :Colorado <br />County :Delta <br />TASK LIST (DIRECT COSTS( <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />01a -Highwallreduction dozer 1 3.01 $437 <br />02a -Rip and grade access road dozer 1 1.7 $256 <br />03a -Regrade east parcel pit Floor dozer 1 12.4 $1,811 <br />04a -Replace topsoil over disturbed areas of site dozer 1 3.7 $542 <br />05a -Revegetate disturbed areas of site revege 2 40.0 $4,919 <br />06a -Transport reclamation equipment to/from site mobilize 3 2.6 $1,066 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />sueroraLS: 63.6 $9,031 <br />' includes inflation faetor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />NA <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />' not requiretl (or eqp. operator serves as super.) <br />TOTAL DIRECT COST' = $9,031 <br />1.55 % of direct total = $140 <br />1.05 % of direct total = $95 <br />NA* NA NA total = NA <br />f0.00 %ofd/rect total= $903 <br /> TOTALOSP= $1,138 <br />CONTRACT AMOUNT (tlirect « 0 & P) _ $10,169 <br />PROJECT MANAGEMENT- <br />Engineering work and/or contracWid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of Intr. NA total = $508 <br />CONTINGENCY- NA` NA total = NA <br /> <br />'confingencies accrountetl ror at tasklevel T07AL INDIRECT COST= $1,648 <br />TOTAL BOND AMOUNT (direct+ indirect) _ $10,677 <br />r--- <br />
The URL can be used to link to this page
Your browser does not support the video tag.