Laserfiche WebLink
<br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTIMATING FORM - EOUI PMENT MOBI LI2ATION /DEMOBILIZATION <br />Task #... 5 Prep. by VHE Filename..M185-5 <br />Date..... 09-Oct-98 Permit # M-81-185 Mine......Mayday Mine <br />Permit Action........ General 110(2) permit bond recalculation <br />Task Description..... Haul reclamation equipment to and from job site <br />HOURLY EOUiPMENT COST <br />_____________ _______= NOTE - This is a list to select from, not a list of marulatory items to include. <br />Mob/Demob Eqp . -Tractor 6x4, 75,000 lb GVw, 375 HP, diesel powered <br /> -Lt. Trailer 25 ton folding gooseneck, drop deck <br /> -Med. Trailer 50 ton folding gooseneck, drop deck <br /> -Hvy. Trailer 120 Ton folding gooseneck, drop deck <br /> -Pilot Car On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br /> -Hyd. Crane Crove RTSBE rough terrain hydraulic crane, 20 ton capacity, 125 hp, 70 ft, boom <br /> -Fuel Truck 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br /> -Luba Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br /> -Flatbed Truck: 30,000 lb GVW, 210 HP, diesel powered <br />Last Update: _______________________________ ___________ ________________ _______________..- -----_____ <br />August, 1997 (trucks) <br />------------- -------- Lt. Rig Med.Rig Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <=25 T. 26-50 T. > 50 T. Car Crane Truck Truck Truck <br />Ownership Lost/hr = E25.59 528.10 531.36 E1.73 524.12 E6.88 512.66 E7.88 <br />Operating Cost/hr = E28.38 530.17 532.34 E4.82 E31.48 E19.57 525.56 E11.82 <br />Operator Cost/hr = E22.61 E22.61 f22.61 521.82 E23. 13 522.35 E21.24 E22.35 <br />Helper Cost/hr = E21.82 E21.82 E21.82 E0.00 E0.00 E0.00 50.00 E0.00 <br /> Total = E98.40 5102.70 E108. 15 E28.37 E78.73 E48.80 E59.46 E42.05 <br />NON-ROAOABLE EOU IPMENT: <br />_____________ _______,._ weight Ownership Haul Rig Fleet S ize Haul Trip Return Trip DOT Permit <br />Machine Desc ription (tons) Cost/hr Cost/hr (no. hauled) Lost/hr Cost/hr Cost/ea <br />___________ <br />___=====oc___ <br />CAT 320 Excav ______ __________ <br />ator <br />_____________ <br />___________________ <br />21.08 E21.55 E98.40 <br />___________ <br />1 <br />________________ <br />E119.95 <br />________________ <br />598.40 <br />Revegetati on Equipment 10.00 E10.00 E98.40 1 5108.40 E98.40 <br />Subtotals 5228.35 5196.80 E0.00 <br />