Laserfiche WebLink
Culvert under permanent road <br />April comments "The inspection then proceeded to culvert #3 that conveys surface runoff <br />from the east area to the north under the permanent road. Riprap channels are located at <br />the inlet and outlet o/this culvert... Additional small riprap is necessary in the ditch both <br />above and below culvert #3 to prevent piping around and under the larger rock. " <br />Observation: This work was found completed as required and as shown in the photograph. <br />.,. <br />.. "~ <br />.. _ ;~.~ <br />Fill B <br />Apnl comments "Final placement of rock on the lower portion o/the side downdrains remains <br />to be completed Also, the east downdrain where it intersects with ditch D96 requires <br />reshaping and final placement of riprap. Minor reshaping of the terrace bench intersections <br />with the west downdrain is also necessary to ensure proper /unction." <br />Observation: This work was found completed in three areas; the lower east ditch riprap, <br />intersection with D96, and re-shaping of the west terrace bench intersection with the <br />downdrain. <br />