My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC38465
DRMS
>
Back File Migration
>
Inspection
>
INSPEC38465
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:43:32 PM
Creation date
11/18/2007 11:06:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
6/14/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />dunng the inspection. Comments also describe any enforcement actions taken dunng the inspection <br />and the facts or evidence supporting the enforcement action <br />This was afollow-up inspection to the April 6. 2004 Phase I bond release inspection <br />conducted by Kent Gorham of the Colorado Division of Minerals and Geology (DMG). <br />Lorencito Coal Company (LCC) submitted an application for Phase I bond release in August <br />2003 following the completion of backfilling and grading at the site. The initial inspection <br />occurred on April 6, 2004 after the application was found complete on March 10, 2004. The <br />purpose of this inspection was to verify that work cited as incomplete in April had been <br />completed by LCC. Ground conditions were dry and the weather was warm. Access was <br />excellent to all areas. <br />The following parties were present for the inspection; Mike Powell, landowner representative; <br />Ron Thompson and Bobby Steele representing Lorencito Coal Company; and Vince Vigil <br />representing Las Animas County (LAC). The inspection began with Mr. Thompson and me <br />meeting at the coal loadout. The other parties arrived shortly after the inspection began on <br />the east side of the disturbed area. to the following narrative below, each issue identified in <br />the April inspection is re-stated in italics followed by observations from this inspection. <br />East end of disturbed area -ditches <br />April comment "Ditch maintenance to remove siltation and final completion of the riprap <br />channel (placement and addition of small rock) are necessary in this area. " <br />Observation: This work had not been completed as acknowledged by the applicant and as <br />shown in the photograph below. <br />_»ar-~!r <br />_,.~.. <br />~ .. e ' w. `~ ~~ <br />:,~ .. ;T~ <br />y <br />
The URL can be used to link to this page
Your browser does not support the video tag.