My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC37651
DRMS
>
Back File Migration
>
Inspection
>
INSPEC37651
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:43:05 PM
Creation date
11/18/2007 11:02:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989029
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
10/3/2001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~, ~ ( Page 9 ) • <br />MINE ID # OR PROSPECTING ID # M-94-027 <br />INSPECTION DATE 4/26/2001 <br />INSPECTOR'S INITIALS TAS <br />The following problems (PB) andlor possible violations (PV) land suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. Review of the permit file indicates that there are no <br />clear or de~=inate plans for final reclamation of the <br />plant site. <br />CORRECTIVE 11CTIONS <br />Submit a permit modification on or before November 30, 2001 <br />to clarify the plans for final reclamation of the existing <br />plant site. A technical revision may be submitted if the <br />plans for f~.nal reclamation of the plant site are consistent <br />with the apF~roved post-mining land uses and plans for the <br />surrounding affected lands. A permit amendment will be <br />required if the reclamation plans for the plant site are <br />to leave the: plant site as an industrial/commercial facility. <br />November 30. 2001 <br />PB or PV PB <br />TOPICIS) RS <br />
The URL can be used to link to this page
Your browser does not support the video tag.