Laserfiche WebLink
<br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee! TRAPPER MINING INC. Permit C-010-81 Field Visit 09/25/2003 Continuation Page <br />Person Number Date <br />28. Performance Standa <br />ides: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, S=Noncompliam <br />1. 1 Mining within Valid Permit <br />2. ~ Mining within Bonded Area <br />3. 1 Terms & Conditions of Permit <br />4. ~ Liability Insurance <br />5. 1 Ownership and Control <br />6. 1 Temporary Cessation <br />7. 1 AML Rec. Fees -- Non-Respondent <br />$. 1 AML Rec. Fees -- Failure to Pay <br />B. Hydrologic Balance <br />1. 1 Drainage Control <br />2. 1 Inspections & Certifications <br />3. 1 Siltation Structures <br />4.~ Discharge Structures <br />5.~ Diversions <br />6. 1 Effluent Limits <br />7. 1 Ground Water Monitoring <br />8.~ Surface Water Monitoring <br />9. 3 Drainage -- Acid-Toxic Materials <br />10.1 Impoundments <br />11. I Stream Buffer Zones <br />C. Topsoil & Subsoil <br />I. 1 Removal <br />2. 1 Substitute Materials <br />3. 1 Storage and Protection <br />D. <br />Backfilling & Grading <br />1. 1 Exposed Openings <br />2. 1 Contemporaneous Reclamation <br />3. 1 Approximate Original Contour <br />4.,~ FCighwall Elimination <br />5. 3 Steep Slopes {includes downslope) <br />6. 3 Handling of Acid & Toxic Materials <br />7. 1 Stabilization (rills and gullies) <br />Excess Spoil Disposal <br />1. 3 Placement <br />2. 3 Drainage Control <br />3. 3 Surface Stabilization <br />4. 3 Inspections & Certifications <br />Coal Mine Waste <br />(Refuse Piles/Impoundments) <br />1. 3 Drainage Control <br />2. 3 Surface Stabilization <br />3. 3 Placement <br />4. 3 Inspections and Certifications <br />5. 3 Impounding Structures <br />Use Of Explosives <br />I. 1 Blaster Certification - <br />2 1 D' to c P h'b'f <br />E. <br />F. <br />G. <br />is n e ro t t tons _ 2) <br />3. 1 Blast Survey/Schedule <br />4. 1 Warnings & Records _ 3) <br />5. 1 Control of Adverse Effects <br /> Performance Standard Catagories <br /> 30 CFR Counterpart <br />A. Administrative .................................. ....................................... <br />1. Valid Permit ................................................... ..................................773.11 <br />2. Mining within Bonded Area ................. _................._..........773.11 <br />3. Terms & Conditions of Permit ............... ..............................773.17 <br />4. Liability Insurance .................................. ..............................800.60 <br />5. Ownership and Control .......................... ..............................778.13 <br />6. Temporazy Cessation......._ ..................... 842.11(e) & 816/817.131 <br />7. AML Rec. Fees -- Non-Respondant_..... ......_ .................870.15(b) <br />8. AML Rec. Fees --Failure to Pay ............ .........................870.15(a) <br />B. Hydrologic Balance ........................... ...........(816/817.41-57) <br />1. Drainage Connol .................................... .....................................45 <br />2. Inspections & Certifications ................... .....__........_.......49(a)(10) <br />3. Siltation Stmctures_ ............................... ..._........_......._.............46 <br />4. Discharge Structures .............................. .....................................47 <br />5. Diversions ............................................... ....................................43 <br />6. Effluent Limits ........................................ .................._........._.....42 <br />7. Crround Water Monitoring ...................._ ................._.............41(c) <br />8. Surface Water Monitoring ...................... ...................._..........41(e) <br />9. Drainage--Acid-Toxic Materials........._ .........................._....41(f) <br />10. Impoundments ........................................ ................................ _..49 <br />1 ]. Sueam Buffer Zones ............................... ....................................57 <br />C. Topsoil &Subsoil ............................... ................(816/817.22) <br />1. Removal .................................................. ................................22(a) <br />2. Substimte Materials ................................. ................................22(c) <br />3. Storage and Protection ............................ .................................22(c) <br />4. Redistribution .......................................... .........._....................22(d) <br />D. Backfilling & Grading ..............................(816/817.95-107} <br />1. Exposed Openings .....................816/817.13, 14, 1 S, & 823.11 & 21 <br />2. Contemporaneous Rec]amation ......................... .........................100 <br />3. Approximate Original Contour .......................... ................102(a)(1) <br />4. HighwallElimination.._........_....._ ................_.. .............._102(a)(2) <br />5. Steep Slopes (includes downslope) .................... ........................107 <br />6. Handling of Acid & Toxic Materi a]s ................. .....................102(c) <br />7. Stabilization (rills and gullies) ........................... .......................95(b) <br />E. Excess Spoil Disposal ................................... ........(816/817.71-74) <br />1. Placement ............................................................... ............................71(e) <br />2. Drainage Contro] ...._........_ ...................._............ ..............................71(1) <br />3. Surface Stabilization ........................._._................ .............................71(g) <br />4. Inspections &Certifications ................................... ............................71(h) <br />F. Coal Mine Waste (Refuse Piles/Impoundments) ,,,,,($16/817.81-84) <br />1. Drainage Con[rol .................................._._........... .........:...................83(a) <br />2. Surface Stabilization .............................................. ............................83(b) <br />3. Placement ............................................................... ............................83(c) <br />4. Inspections and Certifications.........._......_...._ ...... ........_........._......83(d) <br />5. Impounding S[ructures ..................._...................... ............................_..84 <br />G. Use of Explosives .......................................... ........(816/817.61-68) <br />1. Blaster Certification ................................................ ...........................61(c) <br />2. Distance Prohibitions ............................................. ............................61(d) <br />3. Blast Survey/Schedule ............................................ ...........................62-64 <br />4. Warnings & Records .............................................. ........................66 & 68 <br />5. Control of Adverse Effects ..................................... ................................67 <br />H. Subsidence Control Plan .............................. ...........(817.121.122) <br />I. Roads ............................................................. ....(816/817.150-151) <br />1. Road Construction.._ .............................................. ........._..............150(c) <br />2. Certification ............................................................ ..........................151(a) <br />3. Drainage .................................................................. .............150(b)-151(d) <br />4. Surfacing and Maintenance ..................................... .............150(e)-151(d) <br />5. Reclamation ...................._.................._.................. ........................_150(1) <br />J• Signs &Markers .......................................... ..........:..(816/817.11) <br />1. Signs..........._........._........_ ................_.__.............. ........._...ll(a),(b),&(c) <br />2. Mazkers........._...._ ......................_.......................... ._ll(a).(b).(d),(e),&(1) <br /> hibitions. <br />t 1 <br />L. ..••...,"."•..'.....••._•'.. <br />Rev <br />egetation .._(816/817.111116) <br />1. Vegetative Cover..._ ............................................... ...................111 & 116 <br />2. Timing .................................................................... ..............................113 <br />M. Postmining Land Use ..............................................(816/817.133) <br />Page 2 of <br />Elsewhere, 6=Yreviously Cited <br />H. 3 Subsidence Control Plan <br />I. Roads <br />1. 1 Road Construction <br />2. 1 Certification <br />3. 1 Drainage <br />4. 1 Surfacing and Maintenance <br />5. I Reclamation <br />J• Signs & Markers <br />1. 1 Signs <br />2. I Markers <br />K. 1 Distance Prohibitions <br />L. Revegetation <br />1. 1 Vegetative Cover <br />2. 1 Timing <br />M. 1 Postmining Land Use <br />N. Other <br />General <br />Performance <br />Catagory <br />