My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC37406
DRMS
>
Back File Migration
>
Inspection
>
INSPEC37406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:42:56 PM
Creation date
11/18/2007 11:01:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
Inspection
Doc Date
11/5/1997
Doc Name
COLINA ORO MOLINO INC GOLD HILL MILL BOULDER CNTY FN M-94-117 RESPONSE TO CORRECTIVE ACTION ORDER P
From
WALSH ENVIRONMENTAL SCIENTISTS AND ENGINEERS INC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />adit to the tailings pond over a 90 day period could cause the pond to overflow, if the <br />pond already contained the 100 yeaz storm flow. Since 1996 Franklin has installed <br />both a spray evaporation system and a land application system which will dispose of <br />water at a faster rate than it builds up from the estimated adit overflow. Therefore, the <br />calculations performed in 1996 are no longer vahd, and there is no need for a process <br />water storage capacity plan. <br />4. If the DMG does not approve the reclamation plan noted in Item 2, and if the DMG <br />disagrees with the conclusions in Item 3 above, then Franklin will implement the <br />following plan within 90 days, or by January 31, 1998, prior to Spring snowmelt: <br />The tailings will be removed from the thickener in the mill, if necessary, to <br />provide for approximately 80,000 gallons additional process water storage <br />capacity. <br />Additional tailings will be removed from the pond, if necessary, to provide for <br />additional process water storage capacity, or <br />The berm of the pond will be elevated, if necessary, to provide for additional <br />process water storage capacity. <br />Prior to implementing these actions, Franklin/Walsh request a meeting with the DMG to <br />determine what additional process water storage capacity, if any, is necessary. <br />Please call if you have any questions or comments. <br />Sincerely yours, <br /> <br />James B. Cowart, P.E. <br />cc: Rich Brannon, Franklin <br />John Miner, Franklin <br />Tom Lewsader. Franklin <br />~. <br />Wa1s1i <br />Environmental Scientists and Engineers, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.