My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC37193
DRMS
>
Back File Migration
>
Inspection
>
INSPEC37193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:42:50 PM
Creation date
11/18/2007 10:59:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006077
IBM Index Class Name
Inspection
Doc Date
12/14/2006
Doc Name
Inspection report
From
DRMS
To
Paul Morgan Excavating, Inc.
Inspection Date
12/11/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 12/08/2006 <br />User : WHE <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County : Huedano <br />Site :Morgan Pit <br />Attachment no. 2 :3-shank ripper <br /> Utilization <br />Cost Breakdown : Ownership costlhour : $58.50 NA <br />Operating costlhour : $74.00 100 <br />Ripper op.cosUhour : $0.69 10 <br />Operator costlhour : $32.78 NA <br />Total unit costlhour : $165.97 Total fleetcosUhour <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 3, 704 LCY factor : NA volume : 3,704 <br />$165.97 <br />LCY <br />Source of estimated volume : (500'L x 400'W x 0.5'D)/27 = 3703.7 cy <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 931.6 LCYlhr <br />Material consistency description <br />Compacted fil! or embankment <br />Average push gradient : 0.00 % (I <br />Average site altitude : 7,200 feet <br />Material weight : 3,250 Ibs/LCY <br />Weight description <br />Gravel - Pitrun <br />JOB TIME AND COST <br />Fleet size : 1 Dozers <br />Unit cost : $0.562 /LCY <br />Operator skill : 0.75 _ <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.71 <br />Blade type : 1.00 <br />Net correction : 0.32 <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />Permitljob# : M-2006-077 <br />Abbreviation :none <br />Filename : M077-003 <br />295.39 LCY/hr <br />295.39 LCY/hr <br />12.54 Hours <br />$2, 081 <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.