My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC37193
DRMS
>
Back File Migration
>
Inspection
>
INSPEC37193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:42:50 PM
Creation date
11/18/2007 10:59:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006077
IBM Index Class Name
Inspection
Doc Date
12/14/2006
Doc Name
Inspection report
From
DRMS
To
Paul Morgan Excavating, Inc.
Inspection Date
12/11/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 12/08/2006 <br />User : WHE <br />State :Colorado <br />County :Huerfano <br />Site :Morgan Pit <br />PermiUjob# : M-2006-077 <br />Abbreviation :none <br />Filename : M077-002 <br />Agency or organization name :ORMS <br />Permit or other job action : 110c application review <br />Task description :Replace topsoil 0.5' depth for 3H:1V <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8U (2005) Horsepower : 310 <br />Blade type : Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br /> Data source : (CRC) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $58.50 NA <br />Operating cosUhour : $74.00 100 <br />Ripper op.cosUhour: $0.00 0 <br />Operator cosUhour : $32.78 NA <br />Total unitcosUhour : $165.28 Total fl eetcosUhour: $165.28 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 704 LCY factor : NA volume : 704 LCY <br /> <br />Source of estimated volume : (400'L x 95'W x 0.5'D)/27 = 703.7 cy <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,627.0 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 10.00 % (r <br />Average site altitude : 7,200 feet <br />Material weight <br />Weight description <br />Earth -Dry packed <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />2, 550 Ibs/LCY <br />1 <br />50.185 <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.22 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.55 <br />Adjusted unit production : 895.24 <br />Adjusted fleet production : 895.24 <br />Dozers) <br />lLCY <br />Total job time : 0.79 <br />Total job cost : $130 <br />(Cat <br />HB) <br />LCY/hr <br />LCY/hr <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.