Laserfiche WebLink
Excess Saoil <br />The operator has not been able to complete all repairs to fill downdrains due to the lack of a <br />truck to haul rock. Once major re-grading work is completed at the New Elk RDA (#C-81- <br />012), adozer and excavator will be brought to Lorencito to complete repair work due to the <br />previous summers storm runoff <br />Overall, the site appeared in good condition for the winter season. <br />