Laserfiche WebLink
IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required abatement and date of abatement for the <br />violation, previous violations still requiring abatement and the termination of violations cited during previous inspections. <br />Violation CV-2005-005 was issued on May 13, 2005, in two parts. Required abatements of the two parts, <br />includine an option in Part 2, are described (abbreviated) with required abatement dates indicated as follows: <br />Part Descri lion Abatement Date <br /> <br />1 Remove topsoil a setback distance from the sediment control ditch at the 18- <br />Ri ht Ventilation Shaft site. Abated. Ins ected June 14, 2005. 13 June 2005 <br />2a Set back to soil windrows. O lion 2b selected. 13 June 2005 <br />or <br />2b Relocate windrows of to soil to to soil stora a files. 8 Au ust 2005 <br />Violation CV-2005-006 was issued on May 13, 2005, and modified on May 17, 2005, resulting in four parts. <br />Required abatements of the four parts are described (abbreviated) with required abatement dates indicated as <br />follows: <br />Part Descri lion Abatement Date <br /> <br />1 Redesi n/construct NW Mains Ventilation Shafr exem lion treatment facili 13 Jul 2005 <br />2 Include water pumping activity at the 18-Right Ventilation Shag in the project 13 June 2005, <br /> description. extended to <br /> 30 June 2005, <br /> thence to <br /> 15 Jul 2005. <br />3 Include the potential for underground mine water discharges in the description 13 June 2005, <br /> of operations extended to <br /> 30 June 2005, <br /> thence to <br /> 15 Jul 2005. <br />4 Demonstrate compliance of discharge with Rule 4.05.2 13 June 2005, <br /> extended to <br /> 30 June 2005, <br /> thence to <br /> 15 Jul 2005. <br />The operator had submitted a minor revision application to accomplish Parts 2, 3 and 4 by June 13, 2005 <br />(received at the Division on June 10, 2005. The application was found complete on June 13, 2005, but <br />inadequate for Division approval. <br />No enforcement actions were taken during this inspection. <br />NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br />C-1982-056 CP Inspection of June 29, 2005, Page 4 of 4 pages. BG W <br />