Laserfiche WebLink
r <br />(Page 3) <br />MINE ID # OR PROSPECTING ID #: ~~-~nm,~i <br />INSPECTION DATE: 8f~fA7 INSPECTOR=S INITIALS: ~_ <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce their severity when considered <br />by the Mined Land Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />Active mining is in Phase III, prior to reclaiming disturbance in Phase i 11 / /30/ / 07 <br />2. <br />3. <br />PB or PV: -~- <br />TOPIC(S): ~ <br />/ / <br />PB or PV: <br />TOPIC(S): - <br />/ / <br />PB or PV: _. <br />TOPIC(S): <br />