Laserfiche WebLink
111 support Idcilities appeared to be in goof repair.:'1s menti~ated under I hdn+locir lialanre abate. all <br />impoundntrnt titnrcturex appeared to tte in gout repair. <br />I he fish ('reek Lipple struchves arc in disuse and <br />disrepair, btu are progr;utuned li+r demolition. ~ ..mot, <br />Sinking ul the (+ North Mains VentiLuion Shutt <br />eontinucs.:\ tipple Iws heat erected at the site to <br />Jisrhurge materiah exratated loon the ,bolt. See <br />picture to the right. ;1.iumhu is at the Icli of the tipple <br />and section of shall liner. <br />hhe addition to the bathhouse bus been cli+scd in. I he <br />exterior of the new pump house next to the electrical <br />building has been completed. <br />GL?NI:ItAL M[NL PL~'1N C'UMI'LIANCLi <br />the operation is in compliance with the general mine plan. Longwell mining had reached Station g?+ill in the <br />I S Right pone(. 1'he continuous miner had near(} completed work in the 19R (iatewa). <br />I ota yunlily cool was being processed in the uush phmt. and coal mine waste was being hauled to the waste <br />disposal area. <br />Coal was being shipped M truck and by roil. <br />RI:VE(iITr1IlON <br />There bus Ixen no rrvegetation ofdisturhed areas accomplished sincr the last l)ivisiun inspextion. <br />SI ![3SIUI:NC'li <br />Snow cater inhibited observation of'um~ etTecls ofsubsidence. <br />F-.XCFiSS 5P(.)ll. R UGVGLOI'MEN L w'AS'Ck, <br />Llte impoundment portion of the G North 1-lains Ventilation Shall excatated materials storage site is full. <br />RF:C[.AM:ITIUN 51 tCC[SS <br />I hetr bus kxen no reclamation bond releases processed at the Foidcl Minc site. <br />