Laserfiche WebLink
CYCC Office covered with snow. <br />Buildin <br />Sandstones The site was covered with snow. <br />Power <br />Substation <br />Railroad Spur Other than the rails, the site was <br />Extension Area covered with snow. <br />Stoker Coal Sediment control measures looked to <br />Loadout be, throu h the snow, in ood re air. <br />Overland Belt Sediment control measures were in <br />West ood re air. <br />Storage and Not inspected. due to snow on road. <br />Trainin Area <br />7 North Escape Not inspected, snow on primitive light <br />Shaft du road. <br />EMD Sediment control measures were in <br />Ventilation good repair <br />Shaft <br />EMD Authorized but not constructed. <br />Dewatering <br />Treatment <br />Facili <br />Rockfall These trenches were inspected from <br />Hazazd the west end. They appeazed to be in <br />Trenches ood re air. <br />NMD Power Sediment control measures were in <br />Borehole and good repair. <br />Substation <br />NW Mains Appeazed to be in good repair.. <br />Ventilation <br />Shaft <br />18-Right Sediment control measures were in <br />Ventilation good repair. <br />Shaft <br />Haul Road B Sediment traps were covered with <br /> snow. <br /> <br />BACKFILL AND GRADING <br />Areas that require backfill and grading are areas of long-term surface support facilities and underground <br />portals, shafts, and drill holes. No such areas aze under reclamation at this time. <br />PROCESSING WASTE <br />Coal mine waste was being stored on the working pad of disposal Area 2 in compliance with the PAP. <br />SUPPORT FACILITIES <br />C-1982-056. CC Inspection of 14 March 2006 Page 5 of 7 pages. BG W <br />