Laserfiche WebLink
Flarry Kenney <br />Carbon Junction Mine Inspectbn Reports <br />Page 2 <br />October 1, 2003 Inspection Report <br />The mine identification sign is being updated to reflect current information. <br />Under the approved Four Corners Materials amendment that was not finalized through <br />submission of a reclamation bond, Pond 1 was to be the responsibility of Four Corners <br />Materials. As such the Pond was no longer the responsibility of Oakridge Energy. With <br />the current state of flux in responsibility for struchues, I will investigate the location of the <br />DMR. It is my understanding that Four Comers Materials has this information. <br />The rock check dams fo~Pond 2"will be repaired prior to the end of the month. <br />Potential impoundment of water on the previously reclaimed spoil area was addressed <br />above. <br />North Pit backfill will be stabilized as necessary. <br />The CDMG implication that there is no longer an on-site representative or anyone to deaf <br />with on-site problems is a spurious characterization at best. CDMG is fully aware of <br />Oakridge Energy contacts, including Ms. Pautsky, myself, and Goff Engineering. All are <br />available, at contact numbers well known to CDMG to address concerns. <br />With regard to Technical Revision 12, while we have received an adequacy review, we <br />have not received an initial completeness letter, therefore we are concerned with <br />responding to the adequacy review without following the review and notification <br />procedures as set forth in the CDMG regulations. <br />If you have any questions or require any additional information please feel free to call me. <br />Sincerely, _ <br />Michael S. Savage <br />Principal <br />cc: Sandra Pautsky, Oakridge Energy <br />Bryan Duff, Goff Engineering and Surveying <br />