My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC35904
DRMS
>
Back File Migration
>
Inspection
>
INSPEC35904
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:38:00 PM
Creation date
11/18/2007 10:53:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
10/16/1998
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• (Page 3) • <br />MINE ID 7.' OR PROSPECTING ID # M-90-057 <br />INSPECTION DATE 10/16/98 <br />INSPECTOR'S INITIALS ESC <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />DATE <br />1. The permit makes note of an exit shaft, but the maps do not _ <br />include the location of the Hunter shaft. The shaft disturbance PB or PV:PB <br />appears to fall within the the 1.9 acres of disturbance stated TOPIC(S):AR <br />for the mine area, but not within the permit boundaries. _, _, _ <br />CORRECTIVE ACTION: <br />The operator will need to clarify the permit to include the <br />affected area of the Hunter. The permit text and maps must be <br />submitted to the Division within 60 days of the receipt of this <br />report. <br />2. Permit boundary markers could not be located at the mine site as PB or PV:PB <br />required. by Rule 3.1.12. TOPIC (S):SM <br />CORRECTIVE ACTION: <br />The operator will need to post the boundary markers and submit <br />to the Division photographs that the markers were posted within <br />60 days of this inspection report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.