Laserfiche WebLink
RECLAMATION CO~SUMMARY cont'd ~e[ 4 of 4 <br />K. PORTAL(SNAFT SEALING <br />Task No.l Task Description ~ Cost (S) <br />N/A <br />Subtotal (K): <br />L. DRILL HOLE/MON)TORING WELL SEALING <br />Task No.~ ~ Task Description ~ Cost (S) <br />N/A <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (E) <br />b ~ Demolitioroispose of 5'x 10'x10' mass a 50.22/c.f.~ E110 <br />7 ~ Seeding As per attached worksheet. ~ 53,853 <br />Fencing <br />8 ~ Mob/Demob As per attached worksheet. ~ E1,380 <br />Subtotal (M): E5,013 <br />TOTAL DIRECT RELLAMATI ON COSTS (subtotals A through N): E24,442 <br />II. INDIRECT COSTS <br />________________________________________ _______________________________ <br />A. CONTRACTOR'S OVERHEAD & PROFIT <br />Item No.~ Item Description ~ Lost (E) <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ E379 <br />2. ~ Contractor's Performance Bond 1.550% of dir. ~ E379 <br />3. ~ Contractor's Profit........... 70.00% of dir. ~ E2, 444 <br />4. ~ Job Superintendent..Equip. oper. serves as super.) <br />Subtotal (A): E3,202 <br />____________ <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): E27, 644 <br />B. DMG PROJECT ADMINSSTRAT[ON EXPENSES <br />Item No.~ Item Description ~ Cost (E) <br />______._I_____________________..____________________________I____________ <br />1. ~ Minerals Program Adm 5.00% of cntr.l 81,382 <br />NET INDIRECT COST PERCENTAGE: 18.76% Subtotal (6 ): E1,382 <br />__________ ____________ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): E4,584 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): E29, 026 <br />