My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC34976
DRMS
>
Back File Migration
>
Inspection
>
INSPEC34976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:37:12 PM
Creation date
11/18/2007 10:49:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979002
IBM Index Class Name
Inspection
Doc Date
11/9/1998
Doc Name
NORTH DELTA PIT PN M-79-002 ENCLOSED BOND RECALCULATION
From
DMG
To
CORN CONSTRUCTION CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION CO~UMMARY cont'd s7reet 3 Of 4 <br />H. EARTHYORK - STREAM CHANNEL RECONSTRUCT! ON <br />Task No.~ Task Description ~ Cost (E) <br />N/A <br />________________________________________________________________________ <br />Subtotal (H): <br />____________ <br />I. EARTHLIORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description I Cost (E) <br />________I__________________________________________________I____________ <br />N/A <br />Subtotal (1 ): <br />J. EARTNYORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cast (E) <br />4 ~ Replace 6" of topsoil on 2600'L x 25"N lake shore E173 <br />down to water! ne. 7205 c.y. <br />5 ~ Replace b" of topsail on the 7 acre faciliii es ~ E7,583 <br />area. 5647 e.y. <br />Sa ~ Transport, w/loader, topsoil from stockpile to ~ E1,811 <br />replacement area for dozer to spread. Assume <br />haul of 450' and volume of approx 5,000 c.y. <br />Subtotal (J): E3,507 <br />
The URL can be used to link to this page
Your browser does not support the video tag.