My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC34976
DRMS
>
Back File Migration
>
Inspection
>
INSPEC34976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:37:12 PM
Creation date
11/18/2007 10:49:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979002
IBM Index Class Name
Inspection
Doc Date
11/9/1998
Doc Name
NORTH DELTA PIT PN M-79-002 ENCLOSED BOND RECALCULATION
From
DMG
To
CORN CONSTRUCTION CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ROADABLE EQUIPMENT: <br />sheet 2 of 2 <br />-------^-----^---- Total Eqp. Fleet Size Haul Trip Return Trip <br />Machine Description Cost/hr (no, hauled) Cost/hr Cost/hr <br />Subtotals 50.00 60.00 <br />MOB/DEMOB SUPPORT EDUIPMENT: --------- ----.----- <br />-------^------------------- Neight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Non-Roadable Eqp. Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cos:/hr Cost/ea <br />______________________________________________________________________________________ ____ ____ ________________ <br />Subtotals 50.00 90.00 50.00 <br />Total Eqp. Flee[ Size Haul Trip Return Trip <br />Roadable Eqp. Description Lost/hr (no. hauled) Cost/hr Cost/hr <br />Subtotals 50.00 E0.00 <br />EQUIPMENT HAUL DISTANCE 8 TIME <br />Nearest major city or town within project area region: Delta <br />Total one way travel distance = 5.0 miles. Average travel speed = <br />Job Time - Non Roadable Equip.= <br />JOB COST <br />0.50 hours load Roadable Equip.= <br />0.14 hours haul <br />0.50 hours unload <br />0.14 hours return <br />Total Mob/Demob Cost = 51,349.80 <br />35.00 mph. <br />N/A hours load <br />0.74 hours haul <br />N)A hours unload <br />0.)4 hours return <br />NOTE: Non-roadable equipment (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equipment (no haw. rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipmen~: on certain <br />specified road segments within the State. Separate permits are required for each rig on each loaded trip. <br />Additionally, pi Lot cars tone or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading times must be increased substantially for equipment which must be <br />partially dismantled for transport and reassembled at the job site. Casts for lifting equ'pmen[ and of her <br />support equipment needed for This work should be included in the mob/demob costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.