Laserfiche WebLink
<br />Colorado Division of Minerals and Geology sheeC 1 of 2 <br />ESTIMATING FORM - EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />Task #... 8 Prep. by SSS Filename..M002-B <br />Date..... 04-Nov-98 Permit # M-79-002 Mine......North Delta Pit <br />Permit Action........ Routine Bond Recalculation <br />Task Description..... Transport equipment to/from site <br />HOURLY EQUIPMENT COST <br />NOTE - This is a list tc select from, not a list of mandatory item:; to include. <br />Mob/Demob Eqp . -Tractor bx4, 75,ODD lb GVw, 375 NP, diesel powered <br /> -Lt. Trailer 25 ton folding gooseneck, drop deck <br /> -Med. Trailer 50 [on folding gooseneck, drop deck <br /> -HVy. Trailer 120 Ton folding gooseneck, drop deck <br /> -Pilot Car On-highway light duty truck, 4x2, 130 hp, 1/2 tan rating, gasoline powered <br /> -Hyd. Lrane Grove RT58E rough terrain hydraulic crane, 20 ton capacity, 125 hp, 70 ft. boom <br /> -Fuel Truck bx4, 3,600 gallon capacity, 210 HP, diesel powered <br /> -L ube Truck 6x4, 2,500 gallon capacity, 210 HP, di eseL powered <br /> -Flatbed Truck: 30,000 lb GVN, 210 HP, diesel powered <br />Last Update: ________________________..____.._ ___________ __-________.,______ ___-__-________ __________ <br />August, 1997 (trucks) <br />------------- -------- Lt. Rig Med-Rig Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <=25 T. 26-50 T. > 50 T. Car Crane Truck Truck Truck <br />Ownership Cost/hr = 525.59 528.10 531.38 51.73 524.12 56.88 512.66 57.88 <br />Operating Cost/hr = 528.38 530.17 532.34 54.82 531.48 519.57 525.56 511.82 <br />Operator Cost/hr = 822.61 522.61 522.61 521.82 523.13 522,35 521.24 522.35 <br />Helper Cost/hr 521.82 521.82 521.82 50.00 50.00 50.00 50.00 50.00 <br /> Total = 598.40 5102.70 5108.15 528.37 578.73 548,80 559.46 542.05 <br />NON-ROADABLE EOUI PMENT: <br />------------- --------- weight Ownership Haul Rig Fleet S ize Haul Trip Re[urn Trip DOT Permit <br />Machine Description (tons) Cost/hr Cast/hr (no. hauled) Cost/hr Cost lhr Cast/ea <br />CAT D9N w/rippers 52.90 544.97 5108.15 2 5306.24 521~i.30 50.00 <br />Revegetation equipment 10.00 510.00 598.40 1 5108.40 5913.40 50.00 <br />CAT 966E 22.01 525.86 598.40 1 8124.26 593.40 <br />Subtotals 5538.90 541?.10 50.00 <br />_________ _________ _________ <br />