Laserfiche WebLink
IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required abatement and <br />date of abatement for the violation, previous violations still requiring abatement and the termination of <br />violations cited during previous inspections. <br />NOV CV-2005-003 was issued as a result of this inspection, on March 10, 2005. The NOV was <br />modified on March 11, 205. The modified abatement is as follows: <br />ON OR BEFORE June 1, 2005. <br />Submit, within a complete permit revision or technical revision application, a properly certified and <br />Approvable As-Built report, including appropriate narrative, certification statement and drawingls), and <br />properly revised SEDCAD demonstrations, for the two pond (016/016A) system. <br />There are no previous violatiohs still requiring abatement. ' <br />9 <br />