My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC34852
DRMS
>
Back File Migration
>
Inspection
>
INSPEC34852
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:37:06 PM
Creation date
11/18/2007 10:48:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
12/16/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />_ Below are comments on the inspection. The comments include discussion of observations made during the <br />inspection. Comments also describe any enforcement actions taken during the inspection and the facts or <br />evidence supporting the enforcement action. <br />This was a partial inspection of the Yoast Mine conducted on December 16, 2003 by Mike <br />Boulay of the DMG. Roy Kazo of Seneca Coal Company (SCC) was present during the entire <br />inspection. Weather conditions were sunny and cold. Ground conditions at the mine site were <br />wet and mostly snow covered. The dragline was operating above the Wolf Creek coal seam in <br />the Yoast South azea. Coal was being hauled from the mine at the time of the inspection. <br />Roads <br />Only portions of the site were accessible due to snow packed road conditions. Road drainage run <br />outs, road berms and ditches were all snow covered. Haul Roads A and B and the access into the <br />current active pit azea had all been bladed and were accessible and well maintained. <br />Backfill & Gradine, Tonsoil, and Reveeetation <br />Cessation Order CO-2003-012 was issued on October 22, 2003 for failure to complete <br />reclamation required by the approved plan contained in the permit application package; and <br />failure to complete backfill and grading, topsoil redistribution, and seeding for all azeas of the <br />Yoast Mine in accordance with the backfill and grading plan and schedule depicted on Exhibit <br />19-1A (Abatement Steps 1 and 2 of NOV CV-2003-007). Backfilling and grading, topsoil <br />redistribution, and seeding has been completed in the North Pit. The remaining location for <br />which the violation was written is the azea designated for backfill and grading in 2001-2002 as <br />shown on Exhibit 19-1A. This area was assessed during this inspection to determine progress <br />made in completing the abatement steps required for termination of the cessation order. <br />The abatement deadline for CO-2003-012 is January 19, 2004. Backfill and grading work has <br />been completed at this location since the issuance of the cessation order. Topsoil redistribution, <br />and seeding remains to be completed at the 2001-2002 azea. On December 11, 2003, the DMG <br />received an abatement deadline extension request for CO-2003-012 for the topsoiling and <br />seeding activities. The abatement deadline extension request is currently being reviewed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.