My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC34166
DRMS
>
Back File Migration
>
Inspection
>
INSPEC34166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:36:30 PM
Creation date
11/18/2007 10:45:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988021
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DMG
To
Soward Ranch Partnership
Inspection Date
6/25/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 004 State :Colorado Permitfjob# : M-1988-021 <br />Date : 06/27/2003 County :Mineral Abbreviation :none <br />User : JCS Site : Soward Ranch Pit Filename : M021-004 <br />Agency or organization name : DMG <br />Permit or other job action : RECALC FINANCIAL WARRANTY <br />Task description :SPREAD TOPSOIL <br />- ..~- ~~~ <br />x ., " a <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series ll - 8U <br />Blade type : Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br />Horsepower: 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $50.76 NA <br /> Operating cost hour : $61.72 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour : $24.01 NA <br /> Total unit cost/hour : $136.49 Total f leet cosUhour : $136.49 <br />;... :: - ; <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 2,823 LCY factor : NA volume: 2,823 LCY <br /> <br />Source of estimated volume : 3.5 AC W/TH 6 INCHES OF TOPSOIL <br />Source of estimated swell factor : NA <br /> <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 515.8 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshiff/day) <br />Loose stockpile Spoil pile : 0.70 (fnd-mt) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 8, 900 feet Material weight : 0.90 (Cat HB) <br /> Blade type: 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.47 <br />Weight description <br />Earfh - Drv Hacked <br />Adjusted unit production : 242.92 LCY/hr <br />Adjusted fleet production : 242.92 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 11.62 Hours <br />Unit cost : $0.562 /LCY Total job cost : $1,586 <br />f ~ _~ -~ <br />~"~ ~" ; <br />
The URL can be used to link to this page
Your browser does not support the video tag.