My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC34166
DRMS
>
Back File Migration
>
Inspection
>
INSPEC34166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:36:30 PM
Creation date
11/18/2007 10:45:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988021
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DMG
To
Soward Ranch Partnership
Inspection Date
6/25/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />C,~_._.~-~----~- , . <br />PROJECT IDENTIFICATION ~~ <br />Task # : 003 State :Colorado Permit/job # : M-1988-021 <br />Date : 06/27/2003 County :Mineral Abbreviation :none <br />User : JCS Site : Soward Ranch Pit Filename : M021-003 <br />Agency or organization name :OMG <br />Permit or other job action : RECALC FINANCIAL WARRANTY <br />Task description :RIP PROCESSING AREA <br />- ®~ <br />HOURLY EQUIPMENT COST <br />Basic machine <br />Blade type <br />Attachment no. 1 <br />Attachment no. 2 <br />Cat D8R Series lI - 8U Horsepower : 310 <br />Universal <br />BOPS Cab Shift basis : 1 per day <br />3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $50.76 NA <br />Dozer operating cosUhour : $61.72 100 <br />Ripper operating cost/hour : $7.01 100 <br />Operatorcost/hour : $30.65 NA <br />Total unit cost/hour : $150.14 Total fleet cost/hour : $150.14 <br /> <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 1.50 acres Rip depth (ft) : 1.50 Volume : 3,630 BCY or CCY <br />Source of estimated quantity :PERSONAL ESTIMATE <br />Source of estimated load factor : NA <br />:/. .. .~ .: t .. .r. ". u..: ::.. .m <br />HOURLY PRODUCTION <br />Alternate methods - Job condition Correction I-actors - <br />Seismic : Seismic velocity : NA feeUsecond Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 1,934.91 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 1.50 feeUpass Site altitude : 8, 900 feet <br />Average ripping width : 7.08 feetpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 300.00 feeUpass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time: 0.25 minutes/pass <br />Production per unit area : 0.800 acres/hour Adjusted unit production : 1,605.97 cu. yds./hour <br />Unadjusted production : 1,934.91 cu. yds.lhour Adjusted fleet production : 1,605.97 cu. yds./hour <br />f , ; <br /> ~ ~ ~., ~~ ~ . <br />JOB TIME AND COST <br />Fleet size : 1 dozers) Total job time : 2.26 hours <br />Unit cost : $0.093 per cu. yd. Total job cost : $339 <br />
The URL can be used to link to this page
Your browser does not support the video tag.