Laserfiche WebLink
<br />ROUBL- PRODUCTION cont'd <br />Loader Cycle Time cont'd <br />................. <br />6olling Resistance <br />.................. <br />Roadxay underfooting conditions: <br />Haul :Dirt or It. surfaced- Firm, rolling, maimt'd <br />Return:Dirt or lt. surfaced- lira, rolling, maimt'd <br />................................................... <br />Drede Rolling Total <br />Length Resist, Resist, 8eaiat. <br />Raul d return Time: ([tl (xl (%I (XI <br />-------------------------------------------------------------- <br /> <br />Sheet 2 of 2 <br />Travel <br />Time <br />(min.l <br />Raul Route: 300 5.00 3.00 8,00 0.377 (CHB lmxl <br />Return Route: <br />... 300 -5,00 3.00 <br />............................ -2,00 <br />....... 0,233 (COB wry) <br /> Total travel tine = 0.611 <br /> Total cycle time = 1.126 minutes <br />Loader Bucket Capacity <br />...................... <br />Bated Capacity= 1,00 LC- (heaped) <br />Bucket fill factor= 0.975 Looae mat.-moist mined aggregates(95 -100Y1 <br />Adjusted capacity= J.90 LC- <br />Job Condition Correction Factors <br />................................ <br />Site altitude = 7,950 ft. <br />Altitude correctiom factor = 1.00 (CHB cdAl <br />Joh efficieacp factor = 0.83 (lah/day) <br />Net Correction = 0.83 multiplier <br />Unadjusted Hourly Unit Productiom <br />Adjusted Hourly Unit Production <br />Adjusted Oourly Fleet Production <br />207.86 LC-/Nr <br />172,52 LC-/Nr <br />172.52 LC-IAr <br />J08 COST <br />Fleet sine = 1 Loader(s) <br />Unit cost = 10.365 /LC- <br />Total job time = 9.27 Hours <br />Total job cost = 1584.31 <br />