My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC33262
DRMS
>
Back File Migration
>
Inspection
>
INSPEC33262
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:35:45 PM
Creation date
11/18/2007 10:40:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999034
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
12/4/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~:. <br />OFFICE OF THE STATE ENGINEER <br />Division pf Water Resources <br />Department of Natural Resources <br />1313 Sherman 8rreet, fjoom 81 B <br />Denver, Colorado 80203 <br />Phone: (3031 866-3581 <br />FAX: (3071 866-3589 <br />h tt p ://w a l e r. s I a I e. [ o. u s/d a (a u h. h[ m <br />~~, <br />STATE OF COLOI~GCU <br />OF eQf~ <br />r,~ 4 <br />~~ <br />.~F <br />N' <br />RECEIVED '•,a,6 ' <br />MAY ~ 7 1999 <br />..~ Geolo9Y <br />Response to Reclamation PerriTit Application Consideration <br />TO: Carl B. Mount, Senior Environmental Protection Specialist <br />CC: Division 1 Office; District 2 Water Commissioner <br />FROM: Megan Sullivan, Water Resource Engineer rn+c~ <br />DATE: May 17, 1999 <br />RE: Cooley Reservoir 8 Fulton Wildlife Area Pit, File No. M-99-034 <br />Section 17, Twp 2 S, Rng 67 W, 6th P.M., Adams County <br />Operator: CAMAS Colorado Inc. <br />Contact: Mike Refer, CAMAS Colorado Inc <br />3605 Teller St., P.O. Box 5485, Lakewood, CO 80235 <br />(303) 989-0300 <br />gill Owens <br />Governor <br />Greg E. Walther <br />Executive Director <br />Hal D Simpson. P.E. <br />State Engineer <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of <br />ground water must not occur during or after mining operations. <br />® The proposed operation will consume ground water by: ®evaporation, ®dust control, ^ <br />reclamation, ®water removed in the mined product, ®processing, ^ other <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a <br />gravel pit or other type of well permit, as applicable. However, prior to obtaining a permit, <br />an approved water supply plan or decreed plan for augmentation is required. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must <br />then obtain a waiver of objection from all well owners with wells within 600 feet of the permit <br />area or request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS/NOTES: <br />
The URL can be used to link to this page
Your browser does not support the video tag.