Laserfiche WebLink
• (Page 31 • <br />MINE ID # OR PROSPECTING ID # M-85-023 <br />INSPECTION DATE 3/19/99 INSPECTOR'S INITIALS RCO <br />The fallowing problems IPBI andlor possible violations IPVI land suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible Liolations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the ~ined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions tak n. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br /> DATE <br />There are no permit area boundary markers, though they are required to be installed 5 31 /99 <br />pursuant to Rule 3.1.12. <br /> ~~PPB or PV: PB <br />CORRECTIVE ACTION: ~TOPICISI: SM <br />Locate and install boundary markers adequate to delineate the boundary of the II _ _ <br />r <br />affected area. If a revised map is generated showing the locations of the markers, <br />this must also be submitted. <br />The operator must provide evidence to this office of having placed these markers, by <br />submitting narrative and photos, by the date shown at right. <br />2. There are numerous vessels of unknown fluids onsite which are not stored with 4/30/99 <br />adequate secondary containment. I <br /> PB or PV: PB <br />CORRECTIVE ACTION: ~TOPICISI: AT <br />The operator must remove the various containers of hydrocarbons and other fluids ~, , _ <br />from the site. <br />The operator must provide evidence to this office of such removal, by submitting <br />narrative and photos, by the date shown at right. (Until these are removed, their <br />removal costs must be retained in the total bond amount.) <br />3. None. F <br />~B ar PV:_ <br />CORRECTIVE ACTION: (rOPICISI:_ , _ <br />