Laserfiche WebLink
Coal was being shipped by truck and by rail. <br />New shields were in the process of being moved from the surface into the mine. <br />EXCESS SPOIL & DEVELOPMENT WASTE <br />Materials excavated during driving of the 6-North Mains Ventilation Shaft were being placed in the pit <br />excavated for that purpose. <br />C-1982-056. CC Inspection of 4 January 2006 Page 4 of 5 pages. BGW <br />