My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC32920
DRMS
>
Back File Migration
>
Inspection
>
INSPEC32920
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:35:28 PM
Creation date
11/18/2007 10:38:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
1/4/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during the inspection. Comments <br />also describe any enforcement actions taken during the inspection and the facts or evidence supporting the enforcement action, <br />Jerry Nettleton (Nettleton) of Twentymile Coal Company (Twentymile) accompanied Byron Walker (Walker) <br />of the Colorado Division of Minerals and Geology (Division) during this inspection of the Foidel Creek Mine. <br />The permit area was covered with about three feet of snow. <br />SIGNS AND MARKERS <br />Mine identification signs were in place, and in good repair, at all entrances into the permit area from public <br />roads. <br />ROADS <br />The road to the 18-Right Ventilation Shaft was blocked with deep, wind-blown snow. Other roads had been <br />plowed and were in good shape. <br />HYDROLOGIC BALANCE <br />The site was covered with snow, including the impoundments. <br />Sampling sites on streams about the permit area were frozen over and snow covered. No samples were <br />obtained. <br />PROCESSING WASTE <br />Coal mine waste was being placed in storage piles (winter procedure) in the waste disposal Area 2 in <br />compliance with the PAP. <br />SUPPORT FACILITIES <br />Drilling of power boreholes at the 6 North Mains Ventilation Shaft site was complete. The shaft had been <br />driven for approximately 40 feet (deep). Excavated materials were being placed in the pit prepared for that <br />purpose. <br />Roof joists were being set on the bathhouse addition. <br />GENERAL MINE PLAN COMPLIANCE <br />The operation is in compliance with the general mine plan. Longwall mining had reached Station 84+50 in the <br />18 Right panel, and the continuous miner had reached Station 26+00 in the 19R headgate and Station 129+00 <br />in the 19R tailgate. <br />Low quality coal was being processed in the wash plant, and coal mine waste was being hauled to the waste <br />disposal azea. <br />C-1982-056. CC Inspection of 4 January 2006 Page 3 of 5 pages. BGW <br />
The URL can be used to link to this page
Your browser does not support the video tag.