Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID #: nn_~g95_m3 <br />INSPECTION DATE: 6/~Q/n~ INSPECTOR=S INITIALS: K/+P <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce theirseverity when considered <br />by the Mined Land Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />1. During the inspection, it was discovered that topsoil stockpile at the site was devoid of <br />vege a ion <br />is is a pro em ecause .. o e ons ruc ion a ena s u es an egu a ions <br />requires that <br />when topsoil is not replaced on a backfill area within a time short enough to avoid <br />e eriora ion o e <br />opsoi , vege a ive cover or o er means s a e emp oye so a e opsoi is pro ec e <br />from <br />erosion, remains free of any contamination by toxic or acid-forming material, and is in a <br />useable <br />condition for reclamation. <br />2. During the inspection, it was discovered that no protective berms or liner were installed <br />around and under the above ground fuel storage tank located on the permit area. This <br />pus e <br />h drolo is balance at the site as described in 3.1.6 and 3.1.7 of the Construction Materials <br />u es an <br />Regulations, at risk <br />CORRECTION <br />DATE <br />11 /15 /02 <br />PB or PV: <br />TOPIC(S): <br />09 / O5/ 02 <br />PB or PV: <br />TOPIC(S): <br />