Laserfiche WebLink
Processing Waste <br />The refuse disposal area was clearly visible in one of the photographs. The four <br />bench outslopes appeared unremarkable and vegetation looked uniform with no <br />evidence of failure. Close inspection of the downdrains indicates some erosion of <br />the channel lining 1/3 to ~ the way down on both the eastern and western <br />downdrains. The operator should evaluate the extent of this damage and take <br />necessary measures to prevent any possible further damage that could jeopardize <br />stability of the refuse pile. This erosion appears to be further evidence of a <br />significant storm event at this site in the last few weeks. The DMG will make an <br />on-the-ground inspection the week of August 4`h <br />Slides and Damage <br />The development waste pile and other areas did not reveal evidence of any slides <br />or damage due to recent storm runoff. A small puddle of water was visible on the <br />re-spread area of the development waste pile. This small amount of water would <br />not appear to be a threat to stability. <br />Overall, the site appeared in good condition for the summer season. <br />4 <br />