My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC31540
DRMS
>
Back File Migration
>
Inspection
>
INSPEC31540
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:34:21 PM
Creation date
11/18/2007 10:32:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985219
IBM Index Class Name
Inspection
Doc Date
9/8/2004
Doc Name
Insp Rpt
From
DMG
To
Parkerson Construction Co.
Inspection Date
8/30/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~°F c°`O~ COLORADO DIVISION OF MINERALS AND GEOLOGY <br />MINERALS PROGRAM INSPECTION REPORT <br />`*fs,a*~ PHONE: (303) 866-3567 <br />The Division of Minerals and Geology has conducted an inspection of the mining operation noted below. This <br />report documents observations concerning compliance of the mining operation with the permit and the regulations <br />of the Mined Land Reclamation Board. The report notes 1) Areas of successful compliance; 2) Problems and <br />suggested corrective actions and/or 3) Possible violations to be considered for possible enforcement action by the <br />Mined Land Reclamation Board. OPERATORS SHOULD READ THIS REPORT CAREFULLY BECAUSE IT MAY <br />REQUIRE CORRECTIVE ACTION AND/OR RESPONSES TO THE DIVISION IN ORDER TO AVOID <br />CONSIDERATION OF POSSIBLE ENFORCEMENT ACTION BY THE MINED LAND RECLAMATION BOARD. <br />MINE NAME: 32 Road Pit OPERATOR: Parkerson Construction <br />COUNTY: Mesa MINERAL: n r v I TYPE OF OPERATION: 112c <br />INSPECTOR(S): Russ Means, Carl Mount r ~ ~~-o~ <br />MINE ID # OR PROSPECTING ID #: Iv1- 985-212 <br />INSPECTION DATE: <br />INSPECTOR'S INITIALS: <br />INSPECTION TYPE CODEttf: <br />JOINT INSP. AGENCY CODE{Z]: <br />W FATHER CODEI4I: <br />8-30-04 <br />GRM <br />MI <br />NO <br />CR <br />DATE OF COMPLAINT: <br />TIME OF DAY (MILITARY): <br />POST INSP. CONTACTSI~1: <br />REASON FOR INSP. CODE{a>. <br />BOND CALCULATION TYPEI51: <br />N/A <br />1500 <br />NO <br />OP. REP. PRESENT: Alan Parkerson <br />1. INSPECTION TYPE CODE - [CL-IN: IL=Illegal Operation, MI=Monitoring, MP=Mineral Prospect, SI=Surety-related, PR=Pre-operation] <br />2. POST INSPECTION CONTACTS AND JOINT INSPECTION AGENCY CODE - [CL-AG: NO=None, BL=BLM, CH=Colo. Dept. Health; CL=Land <br />Board, CT=Citizen; CW=Wiltllife, FS=Forest Service, HW=Hwy. Dept., LG=Local Government, SE=State Engr.] <br />3. REASON FOR INSPECTION CODE - [CL-RS: AG=Other Agency Request, CT=Citizen Complaint, IE=Normal 18E Program, HP=High Priority, <br />PY=Priority] <br />4. WEATHER CODE-[CL-W E: CL=Cloudy,CR=Clear, IN=Inclement-prevented inspection, RN=Raining, SN=Snowing,WD=Windy] <br />5. BOND CALCULATION TYPE: - [BC=Complete Bond, BP=Partial Bond, NN=None] <br />This list identifies the environmental and permit parameters inspected and gives a categorical evaluation of each. <br />PV is indicated, you will be notified under separate cover when the <br />possible enforcement action. <br />GENERAL INSPECTION TOPICS <br />(AR) RECORDS .................................... ]L (FN) FINANCIAL WARRANTY...... Y_ (RD) ROADS................... 1L <br />(HB) HYDROLOGIC BALANCE ............... ~L (BG) BACKFILL & GRADING....... NA_ (EX) EXPLOSIVES........... NA <br />(PW) PROCESSING WASTE/TAILING...... CIA (SF) PROCESSING FACILITIES..... N~ (TS) TOPSOIL .................L <br />(MP) GENL MINE PLAN COMPLIANCE... ~ (FW) FISH & WILDLIFE ............... N~ (RV) REVEGETATION..... NA <br />(SM) SIGNS AND MARKERS .................. Y (SP) STORM WATER MGT PLAN... Y (SB) COMPLETE INSP..... Y <br />(ES) OVERBURDEN/DEV. WASTE........... NA (SC) EROSION/SEDIMENTATION.. Y (RS) RECL PLAN/COMP... Y <br />(AT) ACID OR TOXIC MATERIALS......... NA (OD) OFF-SITE DAMAGE .............. Y (ST) STIPULATIONS........ NA <br />Y =Inspected and Found In Compliance PV =Inspected and Possible Violations Noted PB =Inspected and Problems Noted <br />N =Not Inspected NA =Not Applicable <br />ORIGINAL -PUBLIC FILE <br />
The URL can be used to link to this page
Your browser does not support the video tag.