My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC31429
DRMS
>
Back File Migration
>
Inspection
>
INSPEC31429
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:34:16 PM
Creation date
11/18/2007 10:31:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987143
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
12/5/1995
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 4) <br />MINE ID # OR PROSPECTING ID # N-87-143 <br />INSPECTION DATE 12/05/95 INSPECTOR'S INITIALS RCO <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Hoard. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />There were no markers present to adequately delineate <br />the permit boundary. <br />Pursuant to Minerals Rule 3.1.12, permit boundaries <br />must be marked. The operator moat install boundary <br />markers, and provide evidence of such installation, by <br />the date shown. (The correction date will allow for <br />seasonal inaccessibility of the site, but corrective <br />actions should be performed ae soon as it is feasible. <br />2. There are several old drums of an unknown pertroleum <br />substance in the creek, in the vicinity of the mine. <br />These pose a potential hazard to the hydrologic <br />balance. <br />If installation of permit boundary markers (as required <br />above) ehowe that the drums are outside the boundary, <br />the operator must notify this Division of that fact, <br />and the problem will be considered abated. <br />If installation of boundary markers ehowe that the <br />drums are inside the permit, the operator must propose <br />a plan to eliminate this hazardous condition, as <br />described in the text of this report. This proposal <br />must be submitted to this Division by the date shown, <br />with the commitment to carry it out by a date <br />sat iefactory to this Division. <br />CORRECTION <br />DATE <br />06/15/96 <br />PB or PV: PS <br />TOPIC(S): SM <br />03/15/96 <br />PB or PV: PS <br />TOPIC(S): 9B,AT <br />
The URL can be used to link to this page
Your browser does not support the video tag.