Laserfiche WebLink
<br />MINE ID # OR PROSPECTING ID # M-77-446 <br />INSPECTION DATE 10-25-99 <br />INSPECTOR'S INITIALS SSS <br />The following problems (PBl andlor possible violations IPVI land suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mired Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br /> CORRECTION <br /> DATE <br />Piles of earthen materials have been imported to the permit area and dumped on site. 12-31-99 <br /> PB or PV: PB <br />CORRECTIVE ACTION: TO'IC{SI: MP <br />Submit a notice of this action to the Division, in compliance with Rule 3.1.5191, and _, _ , _ <br />remove the imported materials from the topsoil stockpile. Remove and properly <br />dispose of all toxic materials that may have been imported to the site. Provide <br />documentation of this corrective action to the Division. <br />2. Thistle infestations occur on the site, especially on the topsoil stockpiles located on 1 1 30-99 <br />the west side of the site. PB .x PV: PB <br />TOF'IC(SI: MP <br />CORRECTIVE ACTION: _ _, _ <br />Perform adequate weed control to bring the weed problem under control within the <br />next three years. Document the weed control efforts that will be taken, and submit <br />them to the Division. <br />3. Some erosion and sedimentation occurring on the outside of the eastern perimeter 11-30-99 <br />stockpile. PB or PV: PB <br />TOPICISI: SC <br />CORRECTIVE ACTION: _ _, _ <br />Install adequate sediment control structures to ensure that sedimentation is kept on <br />site. Repair areas of perimeter road where sedimentation has built up on the road. <br />Provide documentation of this corrective action to the Division. <br />4. Adequate topsoil resources for reclamation of the site may not currently be stockpiled 12-31-99 <br />on site. PB or PV: PB <br />TOP CISI: TS <br />CORRECTIVE ACTION: _ _, _ <br />Identify where and how much topsoil resource exists on site. Ensure that all topsoil <br />resources are appropriately stored and protected. Provide documentation of this <br />corrective action to the Division. <br />(Page 41 <br />