My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC31319
DRMS
>
Back File Migration
>
Inspection
>
INSPEC31319
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:34:12 PM
Creation date
11/18/2007 10:31:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983090
IBM Index Class Name
Inspection
Doc Date
5/18/2000
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
5/10/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..k <br />.F <br />~~}~ ,. <br />;V~t'Page a) <br />- ~ .' ~am...,-' ..., <br />~ .- ~ MINE ID # OR PROSP$CTING~~'ID:I#.[dW83-090 <br />~ INSPECTION DATE~05/7.OJ00,~. <br />t <br />~~ <br />°>,~-.- <br />r:-1 <br />INSPECTOR'S INITIALS E5C•. i <br />,.. <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective. :;q <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all '; <br />corrective actions taken. .t <br />PR08LSNS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />DATE <br />r <br />;i <br />1. At the location of the McNaney property, the drainage channel at _ <br />the inlet and outlet of: the 12" diameter culvert contains a PB or PV:PB <br />build of sediment that may hamper positive surface water TOPIC(S):HB <br />drainage. In addition, the outlet end of the culvert is <br />partially filled with sediment. <br />Within 60 days of receipt of this letter, the operator will need <br />to clean the ditches to ensure positive drainage and clean the <br />sediment from the outlet of the culvert. <br />2. A reclamation plan does not exist for the culvert corridor area <br />from the McNaney property to the fish pond. <br />CORRECTIVE ACTION: <br />~p <br />F <br /> <br />:.. <br />P <br />The operator will need to provide a reclamation plan for the <br />culvert corridor in the form of a technical revision within 60- <br />days of receipt of this report. <br />•.. d <br />a. <br />~ _. _,< r >..+t1°2fif~ _ib~ - ,:. 'si~~.i'... ~`.R~'i-'.'i t$ ::`~::Y.a7 ... .. . _. ,4.' .. . . <br />PB or PV:PB <br />TOPIC(S):88 <br /> <br />•:1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.