My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC31238
DRMS
>
Back File Migration
>
Inspection
>
INSPEC31238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:34:08 PM
Creation date
11/18/2007 10:30:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986040
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
11/10/1997
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 3) <br />MINE ID # OR PROSPECTING ID # M-86-040 <br />INSPECTION DATE 11/10/97 INSPECTOR'S INITIALS CLK <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Hoard. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. The current map does not accurately depict the permit January 3, 1998 <br />boundaries for this site. A new map must be submitted PB or PV PB <br />with the limits of the 25.5 acres clearly indicated TOPIC(S) AR <br />within 30 days. This is in accordance with Rule <br />6 .4 .3(d) of the Construction Materials Rules and <br />Regulations. <br />2. The reclamation plan does not include a description of Feb. 3, 1998 <br />the actions to be taken regarding either the process PB or PV PB <br />building or the tool shop. An Amendment to the permit TOPIC(S) P.R <br />must be submitted within 60 days, explaining the final <br />disposition of these structures. This is in accordance <br />with Rule 6.4.512) of the Construction Materials Rules <br />and Regulations. <br />3. <br />PB or PV <br />TOPIC(S) <br />
The URL can be used to link to this page
Your browser does not support the video tag.