Laserfiche WebLink
.i <br /> RELATIVE CO!4PACTION TEST RESULTS <br />' <br />PROJ ECT: Gob Pile (West Elk) PROJEC T N0: M94 105MT DATE: 8-8-94 <br />LOCA TION: Somerset, Colorado EPJGINE ERING TECH NICIAN: D. Hayes <br />CLIE NT: Mountain Coal Company <br /> DEPTH PROCTOR OPTIMUM DRY ~101STURE P.ELA.TIIIE <br /> <br />TEST <br />LOCATION OR DENSITY MOfSTURE <br />CONTENT DE"!SITY (CONTENT COMPACTION SOIL TYPE <br />N0. ELEVATION PCF $ PCF ~~ ~ <br />11 Lower Refuse Pite - 001 6235.4 77.5 15.5 81.1 4.3 100 Coal gob, black <br />12 Lower Refuse Pile - 002 6237.2 77.5 15.5 74.1 11.0 96 " <br />13 Lower Refuse Pile - 003 6239.8 77.5 15.5 70.4 10.5 91 " <br />14 Lower Refuse Pile - 004 6242.0 77.5 15.5 76.0 7.3 96 " <br />15 Lower Refuse Pile - 005 6240.3 77.5 15.5 71.7 7.6 93 " <br />16 Lower Refuse Pile - 006 6239.6 77.5 15.5 83.5 6.0 100 <br />17 Lower Refuse Pile - 007 6242.6 77.5 15.5 78.7 10.7 100 " <br />18 Lower Refuse Pile - 008 6242.7 77.5 15.5 72.2 3.8 93 " <br />19 Lower Refuse Pile - 009 6243.1 77.5 15.5 71.8 9.7 93 " <br />20 Lower Refuse Pile - 010 6242.5 77.5 15.5 81.4 5.4 100 " <br />REMARKS: The test results indicate the density and moisture content for the location and <br /> <br />I elevation tested only. <br /> RELATIVE COMPACTION TEST RESULTS <br /> ~~ <br /> ~~m bFrt._ ana_._~~~otiat e,~ <br />~~ ~~ <br />