Laserfiche WebLink
. J, ,. ntbert ~~b ~ec~ociateg <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIRLD REPORT <br />PROJECT NUMBER M94105MT DATF..MOnday 8-8-99 <br />PROJECT NAME Gob Pile (West Elk) TECIIN 7CIAN D. Hayes <br />PROJECT LOCATION Somerset, Colorado WEATHER CONDITIONS Overcast <br />CI:IENT Mountain Coal Com pany WORK REQUESTF.^ Density tests <br />CONTRACTOR Mount ain Coal Company FOREMAN Mr. Henry Barbe <br /> <br />WORK PERFORMED BY T.AMBERT AND ASSOCIATES REPRESENTATIVE (AND RF•.MARKS) <br />I arrived at the project site at 10:45 A.M. as requested by <br />Mr. }ienry Barbe. 2 performed soil density tests as requested by <br />Mr. Rarbe on material being placed on the lower refuse pile, using <br />nuclear soil density test methods. Please refer to the test results <br />sheets for approximate test locations and test resu.its. The test <br />locations were determined by Mr. Barbe. The test resu.its indicate <br />only the relative compaction and soil moisture content of the material <br />tested at the elevation and location tested at the time of our site <br />visit. <br />P. O. BOX 908E P. O. BO%0045 214 BODO DR. <br />GRAND JUNCTION, CO 81602 MONTR09E, CO 81402 DURANOO, CO 81301 <br />(303) 246-E60E (303) 2432164 (303) 2695095 <br />