My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC30456
DRMS
>
Back File Migration
>
Inspection
>
INSPEC30456
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:33:32 PM
Creation date
11/18/2007 10:26:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Inspection
Doc Date
8/16/2000
Doc Name
MINE SITE EVALUATION STATE PROGRAM
From
OSM
To
DMG
Inspection Date
7/21/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ Permit Field Visit <br />Person HAYDEN GULCH Number C-081-92 Date 07/2U2000 Continuation Page <br />28. Pertormance <br />~., 3=Not Planned, 4=Not Started, °. <br />1. _ Mining within Valid Perini[ <br />2. _ Mining within Bonded Area <br />3.1 Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Control <br />6.1 Temporary Cessation <br />7. _ AML Rec. Fees --Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />B. Hydrologic Balance <br />1. 1 Drainage Control <br />2._ Inspections & Cenifications <br />3. 1 Siltation Swctures <br />4.1 Discharge Swctures <br />5.~ Diversions <br />6. 1 Effluent Limits <br />7. 1 Ground Water Monitoring <br />8.~ Surface Water Monitoring <br />9.~ Drainage -- Acid-Toxic Materials <br />10. I Impoundments <br />11.1 Stream Buffer Zones <br />C. Topsoil & Subsoil <br />l._ Removal <br />2. Substitute Materials <br />3._ Storage and Protection <br />BackfilBng & Grading <br />1._ Exposed Openings <br />2._ Contemporaneous Reclamation <br />3._ Approximate Original Contour <br />4._ Highwall Elimination <br />5._ Steep Slopes (includes downslope) <br />6._ Handling of Acid & Toxic Materials <br />7._ Stabilization (rills and gullies) <br />Excess Spoil Disposal <br />1._ Placement <br />2._ Drainage Control <br />3._ Surface Stabilization <br />4._ Inspections & Cenifications <br />Coal Mine Waste <br />(Refuse Piles/Impoundments) <br />1._ Drainage Control <br />2._ Surface Stabilization <br />3._ Placement <br />4._ Inspections and Certifications <br />5._ Impounding Structures <br />Use Ot Explosives <br />I ._ Blaster Certification <br />2. Distance Prohibitions <br />3._ Blast Survey/Schedule - <br />4 W &R d <br />D. <br />E. <br />F. <br />G. <br />1) Special focus on TC <br /> <br />_ arntngs ecor s _ 3) <br />5. Control of Adverse Effects <br /> Performance Standard Catagories <br /> 30 CFR Counterpart <br />A. Administrative ......................................................................... <br />1. Valid Pertnit .................................................... .................................777.11 <br />2. Mining within Bonded Area ................. ..............................773.1 <br />3. Terms & Conditions of Permit ............... ..............................773.17 <br />4. Liability Insurance ................................. ...............................800.60 <br />S. Ownership and Control .......................... ......:.......................778.13 <br />6. Temporary Cessation .............................. 842.11(e) & 816/817.131 <br />7. AML Rec. Fees -- Non-Respondant ....... .........................870.15(6) <br />8. AML Rec. Fees -- Failure to Pay ........... ..........................870.15(a) <br />B. Hydrologic Balance ........................... ...........(816817.41-57) <br />1. Drainage Control .................................... .....................................45 <br />2. Inspections &Cenifications .................. ...........................49(a)(10) <br />3. Siltation Stmctures ................................. .....................................46 <br />4. Discharge Swctures ............................. ......................................47 <br />5. Diversions .............................................. .....................................43 <br />6. Effluent Limits ....................................... .....................................42 <br />7. Ground Water Monitoring ..................... .................................41(c) <br />8. Surface Water Monitoring ..................... .................................41(e) <br />9. Drainage--Acid -Toxic Materials .......... .................................41(f) <br />10. Impoundments ....................................... .....................................49 <br />l 1. Stream Buffer Zones ............................. ......................................57 <br />C. Topsoil & SubsoH .............................. .................(816/817.22) <br />1. Removal ................................................. .................................22(a) <br />2. Substitute Materials ................................ .................................22(c) <br />3. Storage and Protection ........................... ..................................22(c) <br />4. Redistribution ......................................... .................................22(d) <br />E. Excess Spoil Disposal ...........................................(816817.71-74) <br />I. Placement ................................................................ ...........................71(e) <br />2. Drainage Control .................................................... ............................71(f) <br />3. Surface Stabdtzation ............................................... ............................71(B) <br />4. Inspections &Cenifications .................................... ...........................71(h) <br />F. Coal Mine Waste (Refuse Piles/Impoumdments) ,,,,,(g16817.81-84) <br />1. Drainage Conuol .................................................... ...........................83(a) <br />2. Surface Stabilization ............................................... ...........................83(6) <br />3. Placemcn[ ................................................................ ...........................83(c) <br />4. Inspections and Certifications ................................. ..........................83(d) <br />5. Impounding Swctures ............................................ ...............................84 <br />G. UseotExplosives ..................................................(816817.61-68) <br />I. BlasterCenification ................................................. ..........................61(c) <br />2. Distance Prohibitions ............................................... ..........................61(d) <br />3. BlastSurvey/Schedule ............................................. ..........................62-64 <br />4. Warnings & Records ............................................... .......................66 & 68 <br />5. Convol of Adverse Effects ..................................... ................................67 <br />H. Subsidence Control Plan ............................... ..........(817.121-122) <br />I. Roads .............................................................. ...(816817.150-151) <br />I. <br />2. <br />3. <br />4. <br />5. <br />J. <br />1. <br />2. <br />D. Backfilling & Grading ..............................(816817.95-107) K. <br />1. Exposed Openings .....................816/817.1 3, 14, 15, & 823.1 1 & 21 L. <br />2. Contemporaneous Reclamation ................. .................................100 <br />3. Approximate OriginalContour .................. ........................102(a)(I) I. <br />4. Highwall Elimination ................................. ........................102(a)(2) 2. <br />5. Steep Slopes (includes downslape) ............ ................................107 M. <br />6. Handling of Acid & Tozic Matetials ......... .............................102(c) <br />7. Stabilization (rills and gullies) ................... ...............................95(6) <br />Road Construction .................................. .........................................I50(c) <br />Cenification ............................................ ..........................................I51(a) <br />Drainage ................................................. ..............................150(6)-151(d) <br />Surfacing and Maintenance .................... ._...........................150(e)-I51(d) <br />Reclamation ........................................... ...........................................150(1) <br />Signs & Markers ........................... ............................(816817.11) <br />Signs ....................................................... ..............................I I (a).(b).&(c) <br />Markers .................................................. ....................11(a),(b).(d),(e).&.(Q <br />Distance Prohibitions .................... ...................................(761.11) <br />Revegetation ................................... ..................(81(il817.111-116) <br />Vegetative Cover ................................... ....................................1 l l & 116 <br />Timing .................................................... .............................................. 113 <br />Postmining Land Use ..............................................(816817.133) <br />Page 2 of <br />ECewhere, 6=Previously Cited <br />H. -Subsidence Control Plan <br />I. Roads <br />1._ Road Construction <br />2._ Certification <br />3. 1 Drainage <br />4. 1 Surfacing and Maintenance <br />5. Reclamation <br />J. Signs & Markers <br />1._ Signs <br />2._ Markers <br />K. -Distance Prohibitions <br />L. Revegefation <br />l._ Vegetative Cover <br />2._ Timing <br />M. _Postmining Land Use <br />N. Other <br />General <br />Pertormance <br />Catagory <br />
The URL can be used to link to this page
Your browser does not support the video tag.