Laserfiche WebLink
<br />COLORADO DIVISION OF MLNERALS A.VD GEOLOGY <br /> <br />BACKHOE COST DATA WORKSHEET ~ REFERENCES: <br />------------------^- "'-'- 1) CONTRACTORS EoUIPMENi COST ~GUfOE <br /> 2) COST REFERENCE GUIDE (overhead) <br />MACHINE DESCRIPTION CATERPILLAR 4268 - 4WD, 1.25 [Y, 15'b~~ DIGGING DEPTX, With EROPS 3) COLORADO CONTRACTORS ASSOCIA iION <br /> ___________________ ____________________________ _________________~ WAGE RATE SCHEDULE <br />Flywheel Horsepower: 79 Operating Weight (cons): 7.77 4) CATERPILLAR PERFORMAN CE HANG 6COK <br />Worksheet Filename: 426B-HOE.WK1 Last Revision Dace: 5/97 <br /> ----------------- -- ------ I ACQUISITION COST: <br />COST FACTORS 8 VALUES: ~ Base purchase price 577,64' <br />--------------------- Less dealer discount 511,97( <br />Acquisition Cos[ 884,893.00 Tire Value Factor 0.046 Plus freight 52,63( <br />Cost of Money Rate 6.375% Tire Life Hours 2600 ~ Plus dealer charges (0.31:) 525`. <br />Economic Life Hours ~ 7080 Tire Purchase Price 53,905 ~ ~ -------- <br />Annual Use Xours 992 Fuel Factor - GPH/HP 0.033 ~ Adjusted purchase price 568,SSi <br />Discount Factor 0.141 Fuel Cost/Gal.- Gasoline 51.20 <br />Freight Factor 0.031 - Diesel 51.07 Plus taxes: State sales a 3% S2,OST <br />Salvage Fac [or 0.132 Lube Factor or E 0.166 ~ SMM 0 2% E1,37i <br />Tax,[nsurance Factor 0.039 2 Shift adj.-D epr. 8 CFC 0.750 <br />CFC Factor 0.040 -Overhead 0.500 ~ Less Lire cost E3,90E <br />Annual Repair Hours 111 3 Shift adj.-D epr. 8 CFC 0.667 Less salvage value 59,OSC <br />Hourly Parts Factor 0.000046 -Overhead 0.333 ~ -------- <br />Supply to Parts Fac [or 0.260 Mechanic Cost/Hr 527.15 ~ NET ACQUISITION COST 559,031 <br />HOURLY COST ELEMENTS: <br />-------------------- ~ ---- HOURLY OWNERSHIP E%PENSES ---- ~ -------------- HOURLY REPAIR 8 FUEL EXPENSES ---- ---- --- <br />MODEL 8 ATTACHMEN TS .~ DESCRIPTION ~ DEPRECIATION CFC OVERHEAD ~ LABOR PAR iS SUPPLIES TIRES FUEL LURE <br />Machine Hodel No. CAT 4268 59.09 53.42 51 .36 53. 04 54.01 E1 .04 51.63 52. 79 50 .46 <br />Attachment #1 N/A 50.00 50.00 50 .00 50. 00 50.00 50.00 50.00 50. 00 50 .00 <br />Attachment C2 N/A 50.00 ~ 50.00 50 .00 50. 00 50.00 50.00 50.00 50. 00 50 .00 <br />Attachment #3 N/A 50.00 50.00 50 .00 50. 00 50.00 50.00 50.00 50. 00 50 .00 <br />COST SUBTOTALS - 1 SHIFT/DAY RATE 59.09 53.42 51.36 53.04 84.01 E1 .OG 51.63 52.79 50.46 <br />2 SHIFTS/DAY RATE: 56.82 52.57 50.68 <br />3 SHIFTS/DAY RATE: 56.06 52.28 50.45 <br />OPERATOR WAGES: <br />-------------- Fringe F. 1.L.A Unempl . Wk.COmp <br />labor Classification <br />---------------------- Zone Designation <br />-------------------- Base Rate <br />------------- Benefits (0 <br />------------- .0770) <br />-------- (0.062) <br />---------- (0.125) <br />----------- Total <br />------ <br />-- ~ Shift Differential <br />_____ (E/h <br />_____ r) <br />__ <br />Operating Eng. Class. Zane A 513.54 53.49 51.04 50. 84 51.69 520. - <br />60 I _-___________ <br />~ Day shift: 50 .00 <br /> Zone B 514.04 53.49 51.08 50. 87 51.76 521. 24 ~ Suing shift: 50. 30 <br />Operating Eng. Class. Zoned 515.02 53.96 51.16 50. 93 51.88 522. 95 ~ Graveyard shift: 50. 45 <br /> Zone 2 515.02 53.96 51.16 50. 93 51.88 522. 95 ~ ---~- -- <br />Mechanic Zone 1 515.32 53.96 51.18 40. 95 51.92 ~E23. 32 ~ 2 shift/day avg. 50 .15 <br /> Zone 2 515.32 53.96 51.18 50. 95 51.92 523. 32 ~ 3 shift/day avg. 80 .25 <br />COST SUMMARY: <br />------------ SINGLE SHIFT BA515 DOU6LE SHIFT BASIS TRIPLE SHIFT BASIS <br /> Zane A Zane B Zane A Zone B Zone A Zone 8 <br />Ownership Lost/H r: 513.87 513.87 510. 06 510.06 88.80 58.80 <br />Operating Cost/Hr: 512.97 512.97 512. 97 512.97 512.97 512.97 <br />Operator Cost/Hr: 420.60 821.24 520. 75 521.39 520.85 521.49 <br />TOTAL COST/HR 547.44 548.08 443. 79 544.42 542.62 543.25 <br />