Laserfiche WebLink
<br />ROADABLE EQUIPMENT: <br />------------------ Total Eqp. Fleet Size Haul Trip Return Trip <br />Machine Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />CAT 426B Backhoe <br />Flatbed Truck 15K GVw <br />E47.44 <br />E34.63 <br /> <br />7 547.44 E47.44 <br />1 534.63 E34.63 <br />-------------------------------------- <br />Subtotals E82.07 E82.07 <br />MOB/DEMOB SUPPORT EQUIPMENT: --------_ _______-- <br />sheet 2 of 2 <br />--------------------------- Height Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Non-Roadable Eqp. Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Lost/hr Cost/ea <br />Subtotals E0.00 E0.00 50.00 <br />Total Eqp. Fleet Size Haul Trip Return Trip <br />Roadable Eqp. Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />-------------------------------------------------------------- <br />Sub[otals E0.00 50.00 <br />EQUIPMENT HAUL DISTANCE 8 TIME <br />Nearest major city or town within project area region: Ouray <br />Total one way travel distance = 9.0 miles. Average travel speed = 70.00 mph. <br />______ _____________ <br />Job Time - Non Roadable Equip.= hours load Roadable Equip.= N/A hours load <br />0.90 hours haul 0.90 hours haul <br />hours unload N/A hours unload <br />0.90 hours return 0.90 hours return <br />JOB COST Total Mob/Demob Cost = 5147.73 <br />NOTE: Non-roadable equipment (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equi Anent (no haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equi Anent on certain <br />specified road segments within the State. Separate permits are required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading times must be increased substantially for equi Anent which must be <br />partially dismantled for transport and reassembled at the job site. Casts for lifting equipment and other <br />support equipment needed for this work should be included in the mob/demob costs. <br />