Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (5) <br />________I__________________________________________________I____________ <br />NA ~ Completed previously <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING HELL SEALING <br />Task No.I Task Description Lost (5) <br />________I_______~_______________________~__________________I__________ <br />NA I Not indicated <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.l Task Description <br />________I__________________________________. <br />Cost (5) <br />2 ~ Demolition assume mass 5'L • 5'11 * 5'H iJ 5.22/cf ~ 528 <br />4 ~ Seeding per attached task 4 worksheet ~ 5498 <br />NA ~ Fencing not required at this time <br />5 ~ Mob/Demob per attached task 5 worksheet ~ <br />_____________________________________________________________ 5148 <br />___________ <br />Subtotal (M): 5674 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 5863 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.l Item Description ~ Cost (5) <br />________I__________________________________________________I_ <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ ___________ <br />E13 <br />2. ~ Contractor's Performance Bond 1.550% of dir. ~ 513 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ 586 <br />4. ~ Job Superintendent..equip operator serves as supel <br />Subtotal (A): 5113 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): E976 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description <br />________I___________________________________________________ Cost (5) <br />___________ <br />1. ~ Minerals Program Admin. Fee at 5.00% of cntr.~ 549 <br />NET INDIRECT COST PERCENTAGE: 18.76% Subtotal (B): E49 <br />__________ _ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): ___________ <br />E162 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 41,025 <br />