Laserfiche WebLink
f <br />• • <br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Lost (E) <br />NA Not indicated <br />Subtotal (N): <br />____________ <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No. Task Description ~ Cost (E) <br />__________________________________________________________I____________ <br />NA ~ Completed previously <br />Subtotal (I ): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (E) <br />___..____I______.,_______________________.,___________________I____________ <br />1 ~ Approx. 4 hours required to distribute 22 cy ~ E190 <br />topsoil over affected areas. <br />(4 Hrs) * (E47.44/h rs) = E189.76 <br />Subtotal (J): E790 <br />