Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID #: ~-~nnn_nsn <br />INSPECTION DATE: lily i.2fu].S INSPECTOR=S INITIALS: A IW <br />The following problems (PB) and/or possible violations (PV( (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce their severity when considered <br />by the Mined Land Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />rnrractiva Actinnr <br />Si ~hmi} n tarhnirnl ravicinn to tha n~1VP`-I Rarmif ap,'nliratinn r^nntnining tha tnllnwi~_ <br />_A cnmmitment to rnnctn in n naw hn~ inrin~y mnrkar 5 feat haynnct tha n mant tamnnm~ <br />the 2H:1 V mining commitment, OR <br />Provide a appropriate engineering evaluation showing that mining can occur at steeper <br />than 2H:1 V from the new boundary. <br />2. <br />3. <br />CORRECTION <br />DATE <br />OB/ 15!05 <br />PB or PV: ~B_ <br />TOPIC(S~: ~dl? <br />BG RS <br />/ / <br />PB or PV: <br />TOPIC(S): - <br />/ / <br />