My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC29627
DRMS
>
Back File Migration
>
Inspection
>
INSPEC29627
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:32:55 PM
Creation date
11/18/2007 10:22:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
9/4/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during the <br />inspection. Comments also describe any enforcement actions taken during the inspection and the facts or <br />evidence supporting the enforcement action. <br />redistribution, and seeding in all areas of the Yoast Mine in accordance with the approved <br />backfill and grading plan and schedule depicted on Exhibit 19-1A by the abatement deadline of <br />October 2003. <br />Slides and Damaee <br />The slide area below the Haul Road D embanlanent above Pond 012 was inspected. <br />Notice of Violation CV-2003-008 was issued in July 2003 for: failure to comply with remedial <br />measures required by the Division and for failure to stabilize by vegetation or other means the <br />areas surrounding the Pond 012 impoundment. No additional work or remedial measures have <br />been implemented at the slide damaged azea since the time of the last inspection. Please <br />complete the following required abatement steps for the slide damaged area by October 20, 2003: <br />1) Reconfigure the slide azea to ensure stability as demonstrated by geotechnical analyses and <br />engineering designs; and 2) As this is an area of continuing failure, establish a monitoring <br />program to validate adequacy of corrective actions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.