Laserfiche WebLink
• • (Page 3) • <br />MINE ID # OR PROSPECTING ID # M-77-193 <br />INSPECTION DATE February 20, 1997 INSPECTOR'S INITIALS TAS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />1 <br />The entrance sign as required by Rule 3.1.12 was not <br />present. <br />CORRECYION <br />DATE <br />March 28, 1997 <br />PB or PV PB <br />TOPIC(S) SM <br />2 <br />3 <br />Post an entrance sign in conformance with Rule 3.1.12 <br />within 30 days. <br />The runoff collection channels along the existing haul <br />road were filled in and therefore not functional <br />Clean the collection channels of sediment so that they <br />can function during future storm events. <br />March 28, 1997 <br />PB or PV PB <br />TOPIC(S) RD <br />PB or PV <br />TOPIC(S) <br />