Laserfiche WebLink
Colorado Division of Nirxrals and Geology <br />' ESTIMATING FpUI - BULL002ER YORK <br />Task M: 2 Prep. by: ACS Tesk File Naaw:: M393-2 <br />Date: X02/23/95 Perwit 1:M-77-393 Hire: Jerkire Site <br />Penoit Action: Monitor irg Inspection M <br />Tesk Description: Grade area south of Coal Creek <br />HOURLY EQUIPMENT COST <br />_______:___::____::_= Basic Machine: Cet D8N Xorsepower: 285 <br />Blade Type: Universal ----~------ <br />Attachment Nt: ROPS Cab Shift Basis: 1/diy <br />Attachaent R2: 1-shank ripper ----~------ <br />~ Cost Breakdown: <br />--- Utilization X (code b$0) <br />Owrw:rship cost/hr = f45.78 N/A <br />Operating 6 overhaul tost/h r- dozer = f40.63 700 <br /> -ripper = f0.92 15 <br />Operator cost/hr = (21.58 N/A <br />Total eapt. unit cost/hr = (108.90 Total f leet cost/hr: 5108.90 <br />MATERIAL QUANTITIES <br />___________________ <br />I nitiel <br />Swell <br />Loose <br />Yolume: 258,160.0 L[Y Factor: N/A Volume: 258,160.0 L[Y <br />Source of quantity take-off: Field estimate <br />Source of est. swell factor: M/A <br />HOURLY PRODUCTION <br />______ __________ Job Condition Correction Factors <br />Avg. push distance: 100 ft. ----------------- ------------ <br />------- Operator.......... : 0.75 (av9J <br />Unadjusted hourly Met. consistency.. 1.00 (Cat tbl) <br />dozer production: 964 LCT/hr Dozing method..... 0.70 (user) <br />-------- Yi si bility........ 1.00 (avg.) <br />Material consistency: Jab efficiency.... 0.83 (1sh/day) <br />Consolidated stockpile Tra~nission type. 1.00 ( PS ) <br />~_____-__-____-- ~_____ Grade adl ustment.. 1.00 (Cat tbl) <br />Avg. push gradient: 0.00 X (nag) Altitude adj. .... 7.00 (Cat tbl) <br />----- Material weight... 0.71 (Cat tbI) <br />Avg. site altitude: 5750 ft. Blade type........ 1.00 (S or U) <br />Materiel weight 3250.00 lb/LCT Net Job Correction 0.31 <br />Mat. Descr.: _r-__-__ <br />Gravel - Pitrun Adjusted Unit Prod.: 296.79 LCT/hr <br /> Adjusted Fleet Production: 296.79 LCT/hr <br />~ JOB COST --____--_ <br />Fleet size : 7 Dozers) Total Job Time: 869.84 Hours <br />Unit Cost 50.367 /LCY Total Jab Lost: f94, 727.24 <br />