Laserfiche WebLink
<br />MINE ID # OR PROSPECTING ID # M-1976-032 <br />INSPECTION DATE 5-25-2000 <br />INSPECTOR'S INITIALS SSS <br />The following problems IPBI and/or possible violations IPVI land suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />Reclamation operations are taking place on the USFS property in the southeast corner 7-31-2000 <br />of the permit area without Telluride Gravel having first submitted the Board ordered PB or PV: PB <br />right of entry for this property and the revisions to the permit addressing these TOPICISI: AR <br />activities. BG , RS , _ <br />CORRECTIVE ACTION: <br />Submit a right of entry to conduct the current and proposed activities on the USFS <br />land within the permit boundary and submit a revision to the permit, addressing <br />operations taking place on the USFS property to achieve final reclamation of the site. <br />2. Buckets and drums of petroleum products have been placed outside the shop 7-7-2000 <br />building. PB or PV: PB <br />TOPICISI: AT <br />CORRECTIVE ACTION: _, _, _ <br />Either remove these containers from the site, or store them in an approved spill <br />containment structure. Ensure that all hazardous materials on site are stored in an <br />appropriate spill containment structure. Submit photo documentation of completion <br />of this corrective action. <br />3. Several patches of noxious weeds were observed on site. 7-31-2000 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPICISI: SF <br />Perform appropriate weed control measures on all noxious weeds on site, and provide _, _, _ <br />documentation of the weed control measures that were taken. Submit a weed <br />control plan that includes provisions for periodic site surveys, by a qualified weed <br />specialist, to identify and appropriately treat all infestations on site. The plan should <br />be drafted with input from the local county weed agent, and be incorporated into the <br />permit through the technical revision process. <br />4. The topsoil pile is not stabilized against erosion and weed infestation. 7-31-2000 <br />PB or PV: PB <br />CORRECTIVE ACTION: TOPICISI: TS <br />Take measures to revegetate, or otherwise stabilize the topsoil pile, to protect it from _, _, _ <br />erosion and infestation by weeds. Provide documentation of the measures taken to <br />stabilize the topsoil pile. <br />(Page 41 <br />